Jump Main Menu. Go directly to the main content

Close menu

INTRANET

English
  1. References

References

Reference


Collecting Bridge for Sinter V

Collecting Bridge for Sinter V
  • Client: ARCELORMITTAL
  • Final client : ARCELORMITTAL
  • Sector / Activity field: Steel and metallurgical sector
  • Location: Veriña, Asturias - Spain
  • Year: 1998
  • Description / Scope: Detailed design, supply, manufacturing and surface treatment of Collecting Bridge for Sinter V.

RELATED REFERENCES

Sector / Activity field: Steel and metallurgical sector

Copyright © 2023 IMASA, INGENIERÍA Y PROYECTOS, S.A.