Jump Main Menu. Go directly to the main content
The project includes engineering, supply, erection and commissioning of a new wagon unloading system RENFE VI and conveying material system, at Veriña factory.
Due to the increase of the amount of coke to be transported between their factories, ArcelorMittal expected the saturation of the current unloading installations. The new facility will allow absorbing this bulk traffic increase by the unloading of wagons and trucks, and it will also include a dust collection system for the control of emissions during unloading maneuvers.