Jump Main Menu. Go directly to the main content
16 results found – Showing from 1 to 16
IMASA executes for the society OCP (L’Office Cherifien des Phosphates) this project at Jorf Lasfar industrial complex in El Jadida, Morocco.
IMASA develops for TERNIUM SIDERAR the engineering, manufacturing, supply, pre-assembly, assembly in site and placement of the wooden upper part of the quenching tower No.1 in the coke oven batteries of San Nicolás de los Arroyos, Argentina.
The Joint – Venture between COBRA Group and the engineering company SENER trust again in IMASA for the prefabrication and mechanical assembly of the piping and equipment of the thermo solar plants they are building in Andalucía
The Latin American Iron and Steel Institute has organized in Buenos Aires (Argentina), from 22 to 26 October 2010, the 51th edition of this congress, with a wide participation of the world steel industry.
The design allows its complete manufacturing in the workshop and the subsequent easier transport to its final location in grouped modules, minimizing the commissioning works and with a higher quality.
IMASA has closed an agreement with the company ARCELORMITTAL for the engineering, refractory supply, demolition, erection and heating for groups of complete walls and groups of flues.
IMASA has been awarded with the second prize in the 6th safety ArcelorMittal Asturias subcontractors awards.
EUROCOKE summit 2010, the European forum for steel and met coke market.
Last month of October, IMASA sponsored the I Event of Safety in Maintenance Operations in Sant Cugás of Valles in Barcelona under the umbrella of the Spanish Association of Maintenance (AEM)
IMASA has closed an agreement with the petrol company TAMOIL for the supply and erection of a steam line which will join the refinery of the Swiss company in Collombey and the incineration company SATOM.
A new website focused on showing IMASA´s capacity for Engineering and Turnkey Projects, Manufacturing, Industrial Maintenance and Erection, Renewable Energies, Environment, Modular Buildings and Industrial Supplies.
IMASA's Manufacturing Division, in the frame of its continuous process of upgrading and revamping the production equipment, has recently purchased and put into operation a state-of-the-art plasma cutting machine.
The turnkey project includes all the necessary works to carry out the revamping of regenerator’s first cells from coke oven batteries 1 & 2 in ArelorMittal factory in Gijón, Spain.
IMASA has been granted the project to extend the refineries of Bilbao and Cartagena. Due to the size of the projects, IMASA has formed a Temporary Working Consortium with the assembly division of DURO FELGUERA and the company from Tarragona COTINSA.
IMASA has implemented for the consortium COBRA PLANTAS INDUSTRIALES and SENER the first commercial plants for parabolic cylindrical collectors in Europe, Andasol I and II.
IMASA has been awarded the project to revamp the ethylene ovens for the REPSOL refinery at Tarragona for the engineering company SELAS LINDE belonging to the German gas company LINDE.
16 results found – Showing from 1 to 16
Copyright © 2012 IMASA, INGENIERÍA Y PROYECTOS, S.A. All rights reserved